More Hwy 172 construction

List of Wisconsin numbered highways
Image via Wikipedia

And another roundabout to boot.

Wisconsin 172 is closed from the entrance to Austin Straubel International Airport west to Overland Road for a $1.4 million roundabout construction project that will last through October.

The project includes a roundabout at the intersection of Wisconsin 172 and Brown County GE (Pine Tree Road), as well as street lighting, decorative landscaping and repaving 1.4 miles of Wisconsin 172, the Wisconsin Department of Transportation said. The contractor is MCC of Appleton.

The road should reopen in October.

Wisconsin 172 traffic is detoured to Wisconsin 54, then to Brown County EB (Packerland Drive).

Brown County GE traffic is detoured to Brown County G (Fernando Drive), then to Brown County EB (Packerland Drive), and Wisconsin 54. (Source: Green Bay Press Gazette)

Powered by ScribeFire.

Enhanced by Zemanta

Share

Advertisements

2 thoughts on “More Hwy 172 construction

  1. Can you tell me if this roundabout at 54 and pine tree road is going to be a one-lane or two-lane roundabout?

Comments are closed.